• More than 550 MW in rectifiers for electrolyzers

    More than 550 MW in rectifiers for electrolyzers

INGECON H2 FSK C6000

This full skid type power station is supplied equipped with everything necessary: ​​one or two INGECON H2 C-lyzer rectifiers, the MV/LV transformer, the MV cells, the auxiliary services panel and the auxiliary services transformer.

Optimized logistics

Being a full skid solution, this power station is a plug & play product, ready to install, easily transportable to any place in the world by land and/or sea. All internal connections are made at the factory, making it a turnkey medium voltage solution.

Datasheets

H2 PowerStation Datasheet

  • 05/05/2026

    Shippax Ferry Conference

    The two-day onboard ferry conference was first organized in 2003 and grows ever more popular each year. Often sold out well ahead, it attracts between...
  • 19/05/2026

    Navalia

    NAVALIA 2024 abrió sus puertas con más de 500 expositores y 1.000 marcas representadas. Además, la feria incrementó las cifras de participación extran...

Do you need more info?

I agree to receive commercial communications from Ingeteam
I have read and I agree to Ingeteam´s privacy terms.
* You have to accept the Ingeteam´s privacy terms.