Presse

Marine and ports

Ingeteam avoids ship heeling and sinking during large item loading and unloading
26.08.2021

Ingeteam avoids ship heeling and sinking during large item loading and unloading

Ingeteam has developed a new technology based on the exhaustive analysis of on board elements and automatic water compensation in the hold to stabilise crane vessels during loading and unloading. This is a Hazitek project, co-financed through the European Regional Development Fund 2014-2020 (ERD...
Read More
Cooperation Agreement with JSC KONAR
08.07.2021

Cooperation Agreement with JSC KONAR

Indar, Ingeteam Group, has signed a Cooperation Agreement with JSC KONAR during the INNOPROM Ekaterinburg event. Signed by Mr. Valery Bondarenko, General Director JSC KONAR & Mr. Peio Pagola (INDAR’s General Director) with the Chelyabinsk Oblast Governor Mr. Alexei Teksler Indar...
Read More
Ingeteam Group has been granted a contract with the CSBC Corporation, Taiwan as the electrical system integrator of the very first Taiwanese built offshore wind installation vessel
25.11.2020

Ingeteam Group has been granted a contract with the CSBC Corporation, Taiwan as the electrical system integrator of the very first Taiwanese built offshore wind installation vessel

Ingeteam was selected as the electrical system integrator for the new project of CSBC-DEME Wind Engineering (CDWE) of the very first floating heavy lift and installation vessel named “Green Jade” to be built in Taiwan for deployment for both the Hai Long and Zhong Neng offshore wind farm projects. S...
Read More
Ingeteam selected as the electrical system integrator for Jan De Nul´s Heavy Lift Vessel “Les Alizés” built at China Merchants Heavy Industry Haimen
15.09.2020

Ingeteam selected as the electrical system integrator for Jan De Nul´s Heavy Lift Vessel “Les Alizés” built at China Merchants Heavy Industry Haimen

Ingeteam signed a contract as the electrical system integrator for the new Heavy Lift Vessel named “Les Alizés” owned by Jan De Nul Group. The vessel will be built at China Merchants Heavy Industry Haimen shipyard and scheduled for delivery in the first quarter of 2022. Les Alizés will be in a super...
Read More
Ingeteam signs the contract with Zamakona Shipyard  (Bilbao, Spain) for the hybrid-electric propulsion system of the new green pelagic fishing trawler for Gitte Henning
30.04.2020

Ingeteam signs the contract with Zamakona Shipyard (Bilbao, Spain) for the hybrid-electric propulsion system of the new green pelagic fishing trawler for Gitte Henning

Ingeteam was selected as an electrical system integrator for the new environmentally friendly pelagic fishing trawler Gitte Henning, to be built at Zamakona shipyard in Bilbao, Spain. The new vessel, designed by Salt Ship Design, will have a number of environmentally friendly solutions, many of them...
Read More
Ingeteam started the commissioning of 2 multipurpose vessels at Remontowa Shipbuilding S.A.
28.02.2020

Ingeteam started the commissioning of 2 multipurpose vessels at Remontowa Shipbuilding S.A.

Ingeteam started the commissioning works of the electrical system of two multipurpose vessels B-618/1 and B-618/2 under the contract with Remontowa Electrical Solutions (Poland). The multipurpose vessels in every-day operations will be performing the key tasks of the Maritime Authorities in Szczeci...
Read More
Seite 2 von 5Erste   zurück   1  [2]  3  4  5  weiter   letzte