07.05.2024
Ingeteam's new laboratory, to be located in Northern Spain, represents an investment of around €25M under the company's strategic plan. Partial tests, type tests and combined power and control electronics tests will be conducted at the new facility, set to become international benchmar...
Read More
03.05.2024
The company has to date equipped 55 GW of generators, converters and control systems for the US wind power market with its technology, representing a 36.55% market share. Ingeteam has a production plant in the United States of almost 7,500 sqm with an annual manufacturing capacity of 3.7 GW for the...
Read More
18.03.2024
At the trade show, which is being held in Bilbao, Ingeteam will showcase its technology for the wind sector, made up of generators, converters, control systems, SCADA systems and a powerful range of services associated with its products. Ingeteam will exhibit once again at the reference trade show...
Read More
15.02.2024
Ingeteam has already supplied the first 15 units of this system that allows the nacelle to pivot on the tower when there is no connection to the grid. This system, powered by renewable energy, replaces the diesel systems used to date. Ingeteam has developed and supplied the first 15 units of its ...
Read More
30.01.2024
Ingeteam expanded its global presence in 2018, when it opened its production centre in India dedicated to the wind energy industry, and since 1999 it already had its wind power converter manufacturing plant in Brazil. Its plants in Brazil and India provide the company with an additional 10,000 m...
Read More
20.12.2023
Since the beginning of activity in 1997, over 32,000 converters and 34,000 generators have been manufactured with Ingeteam technology for the wind industry. Currently, the company owns two production plants in northern Spain with more than 22,000 m2 dedicated to wind power. The company has an annu...
Read More