Press room

We have commissiones a wind power simulator
23.12.2010

We have commissiones a wind power simulator

The budget of nearly 500,000 euros includes the supply, delivery and installation of an IngeDrive LV 400 frequency converter, IngeSYS IT control and monitoring software, and a multiplier for a 2 MW doubly-fed wind turbine.
On the test bench, where the simulator will be located, different tests for wind frequency and behavior of the components that make up the wind turbines will be carried out and analyzed.

The results obtained will yield significant advances in the new technologies employed.
The tender was granted by the Institute for Research of Renewable Energy of the University of Castila-La Mancha, under the Albacete Scientific and Technological Park and financed by the Ministry of Science and Innovation
 

Share: