Press room

We have commissiones a wind power simulator
23.12.2010

We have commissiones a wind power simulator

The budget of nearly 500,000 euros includes the supply, delivery and installation of an IngeDrive LV 400 frequency converter, IngeSYS IT control and monitoring software, and a multiplier for a 2 MW doubly-fed wind turbine. On the test bench, where the simulator will be located, different tests for w...
Read More
23.11.2010

Indar manufactures hydraulic equipment for a facility in Taiwan

Indar Máquinas Hidráulicas, which has received the order this year, is completing the manufacture of eleven submerged pieces of equipment for a Taipei Water Department facility located in Taiwan. This equipment will allow drinking water to be supplied to the people of Taipei. The order consists of ...
Read More
Strana 90 z 90První   Předchozí   81  82  83  84  85  86  87  88  89  [90]  Další   Poslední