Power grid automation, protection and control > Secondary distribution automation

Secondary distribution automation

Case Studies

IEC 61850 laboratory

Communications Interoperability project to simulate the behavior of protection and control systems

Magdalena II (Mexico)

E-House solution for 34.5 / 230 kV substation

Escatrón (Spain)

800 MW photovoltaic complex, the largest in Europe

Beizi (Taiwan)

Retrofit to IEC 61850 of 161/69/23/11 kV substation

Jasper (South Africa)

132 / 22 kV substation control system for photovoltaic power plant

King Palace (Thailand)

RMU automation and monitoring

Documents

Power Distribution Solutions catalogue

Global view of the solutions and product ranges for Smart Grids

  • 28/02/2024

    K.EY ENERGY

    The second edition of KEY - The Energy Transition Expo is scheduled from the 28th of February to the 1st of March, 2024, the ...
  • 13/03/2024

    ASIA PACIFIC MARITIME

    The Global Maritime Community in Asia This March, APM welcomes the ecosystem of the Shipbuilding & Marine, Workboat, Offshore and Port Technology...
  • 20/03/2024

    WindEurope Annual Event 2024

    When it comes to wind, Spain is one of Europe’s leading lights In onshore wind, we’re one of the most important countries on the continen...
  • 25/03/2024

    BE POSITIVE

    Faced with today’s huge climate change issues, it’s a time of revolution in the energy and building sectors. Boosted by European...
  • 04/04/2024

    EFICAM

    EFIC@M, a lo largo de sus siete anteriores ediciones, ha conseguido posicionarse como referente de tecnología, innovación, formación e información de ...
  • 16/04/2024

    MIDDLE EAST ENERGY

    Middle East Energy, the region's most anticipated energy event is all set to be back with its 49th edition, running from the 16th to the 18th of A...

Do you need more info?

I agree to receive commercial communications from Ingeteam
I have read and I agree to Ingeteam´s privacy terms.
* You have to accept the Ingeteam´s privacy terms.
Smart Grids - Social media

Newsletter: Subscribe

LinkedIn: View page

 

Smart Grids - Contact

E-mail: marketing.pga@ingeteam.com

Phone: (+34) 944 039 600

Address: Ingeteam Power Technology, S. A. - Parque Tecnológico de Bizkaia, Edificio 110 - Zamudio, 48170, Spain