We have commissiones a wind power simulator
23/12/2010

We have commissiones a wind power simulator

The budget of nearly 500,000 euros includes the supply, delivery and installation of an IngeDrive LV 400 frequency converter, IngeSYS IT control and monitoring software, and a multiplier for a 2 MW doubly-fed wind turbine. On the test bench, where the simulator will be located, different tests for w...
Read More
23/11/2010

Indar manufactures hydraulic equipment for a facility in Taiwan

Indar Máquinas Hidráulicas, which has received the order this year, is completing the manufacture of eleven submerged pieces of equipment for a Taipei Water Department facility located in Taiwan. This equipment will allow drinking water to be supplied to the people of Taipei. The order consists of ...
Read More
Page 113 of 113First   Previous   104  105  106  107  108  109  110  111  112  [113]  Next   Last