• More than 550 MW in rectifiers for electrolyzers

    More than 550 MW in rectifiers for electrolyzers

INGECON H2 FSK C6000

This full skid type power station is supplied equipped with everything necessary: ​​one or two INGECON H2 C-lyzer rectifiers, the MV/LV transformer, the MV cells, the auxiliary services panel and the auxiliary services transformer.

Optimized logistics

Being a full skid solution, this power station is a plug & play product, ready to install, easily transportable to any place in the world by land and/or sea. All internal connections are made at the factory, making it a turnkey medium voltage solution.

Datasheets

H2 PowerStation Datasheet

  • 25/02/2025

    Intersolar North America

    In March of 2019, Diversified (a leading international media company) marked its entry into the renewable energy industry with the acquisiti...
  • 25/02/2025

    ERCOT Market Summit

    Faced with an unprecedented expansion of energy demand across Texas, driven by new data centers, manufacturing facilities, electrification of the oil ...
  • 04/03/2025

    Expofimer

    La tercera edición de EXPOFIMER se celebrará en Feria de Zaragoza, los días 4 y 5 de marzo de 2025, con el objetivo de repetir el éxito cosechado en l...

Do you need more info?

I agree to receive commercial communications from Ingeteam
I have read and I agree to Ingeteam´s privacy terms.
* You have to accept the Ingeteam´s privacy terms.