INGECON H2 FSK C6000

This full skid type power station is supplied equipped with everything necessary: ​​one or two INGECON H2 C-lyzer rectifiers, the MV/LV transformer, the MV cells, the auxiliary services panel and the auxiliary services transformer.

Optimized logistics

Being a full skid solution, this power station is a plug & play product, ready to install, easily transportable to any place in the world by land and/or sea. All internal connections are made at the factory, making it a turnkey medium voltage solution.

Datasheets

H2 PowerStation Datasheet

  • 13/03/2024

    ASIA PACIFIC MARITIME

    The Global Maritime Community in Asia This March, APM welcomes the ecosystem of the Shipbuilding & Marine, Workboat, Offshore and Port Technology...
  • 20/03/2024

    WindEurope Annual Event 2024

    When it comes to wind, Spain is one of Europe’s leading lights In onshore wind, we’re one of the most important countries on the continen...
  • 25/03/2024

    BE POSITIVE

    Faced with today’s huge climate change issues, it’s a time of revolution in the energy and building sectors. Boosted by European...

Do you need more info?

I agree to receive commercial communications from Ingeteam
I have read and I agree to Ingeteam´s privacy terms.
* You have to accept the Ingeteam´s privacy terms.