Press room

Wind Power

We have commissiones a wind power simulator
23/12/2010

We have commissiones a wind power simulator

The budget of nearly 500,000 euros includes the supply, delivery and installation of an IngeDrive LV 400 frequency converter, IngeSYS IT control and monitoring software, and a multiplier for a 2 MW doubly-fed wind turbine. On the test bench, where the simulator will be located, different tests for w...
Read More
Page 17 of 17First   Previous   8  9  10  11  12  13  14  15  16  [17]  Next   Last