02/06/2017
The GWO (Global Wind Organization) has certified the Management Systems of three of Ingeteam's places of work. The centres certified are: the head offices of Ingeteam in Albacete; the centre in Mexico, located in Juchitán de Zaragoza; and the centre in Chile located in Las Condes. The certificate aw...
Read More
13/03/2017
One of the largest PV plants in Australia has been now inaugurated, namely the Moree Solar Farm, with a rated power of 56 MWac (70 MWp). This project has been the first utility-scale solar plant in the country to be equipped with a system that allows the PV panels to follow the path of the sun, from...
Read More
16/01/2017
Ingeteam has presented its latest R & D project at the Technical Conferences on Marine Energy: the "POSEIDOM" project. This is a new and powerful computer tool that will allow calculation of optimal Operation and Maintenance strategies and reduce uncertainty related to costs during the operation...
Read More
21/11/2016
The Conference was attended by a hundred participants, including prominent personalities of leading companies in the energy sector both nationally and internationally and was opened by the President of Ingeteam Group, Teresa Madariaga. The day organized by Ingeteam Service under the name of "N...
Read More
21/11/2016
It´s 39 Vestas V-90 wind turbines located in the Windfarm Munera Munera I and II of EDPR. This milestone adds to the maintenance contract reached 17 aerogeneraods V90-3MW in Poland through Energa, one of the four most important energy companies in Poland. Maintaining a stable path crecim...
Read More