INGECON H2 FSK C6000

This full skid type power station is supplied equipped with everything necessary: ​​one or two INGECON H2 C-lyzer rectifiers, the MV/LV transformer, the MV cells, the auxiliary services panel and the auxiliary services transformer.

Optimized logistics

Being a full skid solution, this power station is a plug & play product, ready to install, easily transportable to any place in the world by land and/or sea. All internal connections are made at the factory, making it a turnkey medium voltage solution.

Datasheets

H2 PowerStation Datasheet

  • 13/05/2024

    IFAT 2024

    From International Trade Fair for Sewage Technology to Global Network for Environmental Technologies. IFAT has come a long way since the first event i...
  • 16/05/2024

    WES 2024

    The Pump Centre is looking forward to welcoming you to The Water Equipment Show, next year at The Telford International Centre on May 1...

Do you need more info?

I agree to receive commercial communications from Ingeteam
I have read and I agree to Ingeteam´s privacy terms.
* You have to accept the Ingeteam´s privacy terms.