• More than 550 MW in rectifiers for electrolyzers

    More than 550 MW in rectifiers for electrolyzers

INGECON H2 FSK C6000

This full skid type power station is supplied equipped with everything necessary: ​​one or two INGECON H2 C-lyzer rectifiers, the MV/LV transformer, the MV cells, the auxiliary services panel and the auxiliary services transformer.

Optimized logistics

Being a full skid solution, this power station is a plug & play product, ready to install, easily transportable to any place in the world by land and/or sea. All internal connections are made at the factory, making it a turnkey medium voltage solution.

Datasheets

H2 PowerStation Datasheet

  • 14/10/2025

    Clean Currents 2025

    Clean Currents—the official water power trade show + conference of the non-profit National Hydropower Association—heads to Pittsburgh, Pen...
  • 22/10/2025

    HYDRO 2025

    The elegant port city of Thessaloniki, overlooking the Aegean Sea, will be a perfect venue for HYDRO 2025, in a country entering a new era of hydropow...
  • 22/10/2025

    Oil&NonOil

    Oil&nonOil is the only Italian and among the most important events in Europe dedicated to the fuel distribution chain. After the successful outco...

Do you need more info?

I agree to receive commercial communications from Ingeteam
I have read and I agree to Ingeteam´s privacy terms.
* You have to accept the Ingeteam´s privacy terms.