Press room

Text/HTML

Visit to the Dalgaranga mine in Gascoyne
14/10/2019

Visit to the Dalgaranga mine in Gascoyne

The director of the IMD business unit (Beñat Izaola) and manager of the Ingeteam office in Australia (Juan Miguel Gutierrez) had the opportunity to visit the Dalgaranga mine before summer. The mine is located in Australia and both met with our client GRES and the owner of the Gascoyne mine to study the operation of the converter and mining process.

 

The water-cooled INGEDRIVE MV500 converter, which has a nominal power of 6 MW and an output of 3.3 kV, has been operating in optimal conditions for three years.


Share: