Ingeteam is proud to have participated in the construction of the Subsea Construction Vessel KHANKENDI. The vessel was specifically designed and built by Azerbaijan’s Baku Shipyard to install the biggest subsea production system in the Caspian Sea as part of the BP-operated Shah Deniz Stage 2 project.
The electrical generation is carried out by 6 alternators of 4.200 kW and 2 of 3.350 kW, generating a voltage of 6.6kV.
Ingeteam Scope of Supply:
For Main Electrical System:
• 2 x 4,941 kVA Main Generators
• 2x 3,647 kVA Main Generators
• 6.6 kV Main Switchboard
• 2x 4,000 kVA Distribution Transformer
• 2x 3,500 kVA Distribution Transformer
• 2x 1,200 kVA Distribution Transformer
• 2x 1,000 kVA Distribution Transformer
• 2x 4,500 kVA 18 pulse Transformers for Azimuth thrusters
• 2x 3,700 kW, INGEDRIVE LV 18 pulse Frequency Converters for Azimuth thrusters
• 2x 3,7000 kW Asynchronous Motors for Azimuth thrusters
• 2x 3,700 kVA 12 pulse Transformers for Tunnel thrusters FWD
• 2x 3,100 kW, INGEDRIVE LV 12 pulse Frequency Converters for Tunnel thrusters FWD
• 2x 3,1000 kW Asynchronous Motors for Tunnel thrusters FWD
• 2x 3,700 kVA Transformers for Retractable thruster FWD
• 1x 3,000 kW, INGEDRIVE LV AFE Frequency Converter for Retractable thruster FWD
• 1x 3,0000 kW Asynchronous Motor for Retractable thrusters FWD
• 2x 1,850 kVA Transformers for Tunnel thruster AFT
• 1x 1,500 kW, INGEDRIVE LV AFE Frequency Converter for Tunnel thruster AFT
• 1x 1,500 kW Asynchronous Motor for Tunnel thruster AFT
• Engineering and Workshop Testing
• Commissioning and Sea Trials
For Integrated Alarm Monitoring System:
• PLC's Network
• 12,500 I/Os
• Human Machine Interfaces (HMI)
• Power Management System (PMS)
• Commissioning and Sea trials