Power Transmission and Distribution

Ingeteam supplies the Protection and Control Systems for the substations of the largest photovoltaic complex in Europe
19/02/2020

Ingeteam supplies the Protection and Control Systems for the substations of the largest photovoltaic complex in Europe

Ingeteam has taken part in the largest solar installation in Europe by providing the engineering, supply and commissioning of the Protection and Control Systems of the four substations that distribute the energy generated in the park. This large energy facility, inaugurated at the beginning of the y...
Read More
Ingeteam leads the pack in installing control and protection systems for renewable projects in Spain
05/02/2020

Ingeteam leads the pack in installing control and protection systems for renewable projects in Spain

In 2019, Ingeteam commissioned the control and protection systems for electricity grid substations responsible for evacuating approximately 2,000 MW of renewable energy. This amounts to approximately one third of over 6,000 MW installed in Spain during this period. These projects are mainly the resu...
Read More
Ingeteam modernizes the existing distribution substation of Lung Suan (Chum Phon, Thailand)
30/01/2020

Ingeteam modernizes the existing distribution substation of Lung Suan (Chum Phon, Thailand)

The Lung Suan substation in Thailand, belonging to the PEA (Provincial Electricity Authority) electricity company, has been successfully energized by our local partner Power Utah Group Co. Ltd., with a control and protection system supplied by Ingeteam based on IEC 61850. The system includes equipme...
Read More
INGESYS™ IT and INGESYS™ eFS framework version 7.0
21/01/2020

INGESYS™ IT and INGESYS™ eFS framework version 7.0

The new version 7.0 of the INGESYS™ IT real-time monitoring software and the INGESYS™ eFS engineering and maintenance toolkit incorporates remarkable improvements in cybersecurity, such as user and permission management, thanks to the use of digital certificates. On the other hand, web panels based ...
Read More
New project finished at the Philip Morris production plant in Bucharest
22/11/2018

New project finished at the Philip Morris production plant in Bucharest

New project recently finished by one of Ingeteam’s integrators in Romania (Tempos Serv SRL) at the Philip Morris production plant in Bucharest. The connection of PHILIP MORRIS RUMANIA S.R.L. to the National Electrical System is via a 110/20kV substation. The well-equipped substation consists of a 11...
Read More
Ingeteam collaboration with UNIT71-LAB cybersecurity laboratory
03/09/2018

Ingeteam collaboration with UNIT71-LAB cybersecurity laboratory

Ingeteam is collaborating with the company ITS Security at the UNIT71-LAB cybersecurity laboratory with SCADA SYSTEMS, RTUs and substations IEDs. At the UNIT71-LAB industrial cybersecurity laboratory it is possible to analyse and reconfigure possible production network attacks to stud...
Read More
Page 6 of 15First   Previous   1  2  3  4  5  [6]  7  8  9  10  Next   Last